Floor Panels:
If the walk-in you are installing does not come with a prefabricated floor, skip this section.

Lay out the outside dimensions of the prefabricated floor with a chalk line. We recommend a 2″ air space from any building walls. The entire prefabricated floor must be level. If the existing surface is not level, wooden shims (provided by the installer) are commonly used to accomplish this.

Run a bead of caulking on both sides of the camlocks the full length of the floor panels before camlocking the floor panels together. As you lock the floor panels together keep checking to make sure they are level.

Wall Panels:
If no prefabricated floor is supplied, lay out the outside dimensions of the walk-in with a chalk line on the surface being used. We recommend a 2″ air space from any building walls. The 16 gauge 3/4″ x 3/4″ metal screed is to be secured to the floor with Hilti Drive Pin #W10 or equal @ 23″ on center max. The wall panels have a groove at the bottom of each panel that the vertical portion of the metal screed slides into. Install the metal screed at half the thickness of the wall panels. The vertical portion of the angle needs to be facing towards the inside of the room and should be in from the chalk line half the thickness of the wall panel. Stop the screed 12″ from each corner and at the door sections. From the inside of the room the wall is then secured to the 16 gauge 3/4″ x 3/4″ metal screed with a #14 x 3″ Hex Washer Tex Screw @ 23″ on center max.

If a prefabricated floor is supplied, the 16 gauge 3/4″ x 3/4″ metal screed is to be secured to the floor with #14 x 1-1/4″ Phillips Pan Head Screws @ 23″ on center max. The wall panels have a groove at the bottom of each panel that the vertical portion of the metal screed slides into. Install the metal screed at half the thickness of the wall panels. The vertical portion of the angle needs to be facing towards the inside of the room and should be in from the chalk line half the thickness of the wall panel. Stop the screed 12″ from each corner and at the door sections. From the inside of the room the wall is then secured to the 16 gauge 3/4″ x 3/4″ metal screed with a #14 x 3″ Hex Washer Tex Screw @ 23″ on center max.

Note: To assure you have a perfect 90 degree corner, measure in one direction 3 feet and in the other direction measure 4 feet. Then measure diagonally across these two points you should have 5 feet.
After installing the metal screed place a bead of caulking on both sides of the metal screed. After you install the first wall panel, run a bead of caulking on both sides of the camlocks the full height of the wall panels before camlocking the remainder of the wall panels together. As you lock the wall panels together keep checking to make sure they are level. The entire installation must be level.

Alternate Wall to Floor Connection:
This is an alternate method of securing the wall to floor surface in lieu of the method listed above.
At times in addition to the instructions listed previously a 1-1/2″ x 1-1/2″ 16 gauge continuous angle will be supplied as additional connection strength on the interior, and exterior, if possible. The screws will be the same as listed above.
Run a bead of caulking along the wall before installing the angle.

Door Section – With Self Closing Door Hardware:
Before removing the door from the door section, if this is a SELF CLOSING door please follow these steps.
When you OPEN the door BEFORE removing it from the door section, MARK the strap hinge which is attached to the door – location in relationship to the and also MARK the base of the hinge which is mounted on the door section. When you install the door to the door section just line the two marks together and set the door in place.

Ceiling Panels Lagged Down:
On the top of the wall panels, horizontal plane, run a bead of caulking on the front and back. Align the ceiling panels to the edge of the wall panels. Before locking any of the ceiling panels together run a bead of caulking on both sides of the camlocks the full length of the ceiling panels. After the ceiling panels are locked together, run a 3/8″ lag screw with flat washer, through the ceiling into the top of the wall panel until the gasket seals tight @ 23″ on center max.

Ceiling Panels Camlock:
On the top of the wall panels, horizontal plane, run a bead of caulking on the front and back of the camlock. Align the ceiling panels to the edge of the wall panels. Before locking any of the ceiling panels together run a bead of caulking on both sides of the camlocks the full length of the ceiling panels. After the ceiling panels are locked together, lock the ceiling panels to the wall panels.

Finish Trim:
Once you have finished installing the wall, ceiling and floor panels you are now ready to install the finishing trim. On the exterior of the walk-in at the top of the wall panels where there is exposed wood from the end of the ceiling panels you need to attach the “top cap”. This is a piece of metal that is 7-1/2″ long with a 90 degree bend on one end and a slight bend on the other end. You attach this metal with#8 x 5/8″ Phillips Pan Head Tek Screw @ 24″ on center max.

Securing the door section. To do this you will use the 1-1/2″ x 1-1/2″ x 6″ long 16 GA galvanized angle that came with the box. Attach these angles on the interior side, at the bottom of the door section. Before installing the angles, run a bead of caulking along the wall.

Install the cove base that goes along the bottom of the wall panels on the interior and the exterior of the walk-in. This is a 6″ piece of metal with a ½” bend on one end and a 1″ bend at the other end. The smaller of the two bends faces upwards. The cove base is attached using #8 x 5/8″ Phillips Pan Head Tek Screws @ 24″ on center max. Before installing the cove base, run a bead of caulking along the wall.
Use the cap plugs that were sent with the walk-in and plug up all of the camlock holes.

Note: If the walk-in is being installed adjacent to a building wall use the some of the 7-1/2″ top cap to close off the area between the building wall and the walk-in. Turn the top cap vertically and attach it to the corner of the wall extending past the opening and butting up against the building wall. Use the same screws as you did with the top cap.

Hinged Door:
Pick up the door and place each of the hinge shafts into the shaft hole.
Note if this is a self closing door; follow the instructions listed on page 1.

Give TPH Mechanical a call today! 602-845-9899 or visit us at www.tphmechanical.com

About Commercial Repair Guru

TPH Mechanical has been serving the Metro Phoenix Area for the past 23 years. We are a customer service orientated business, just like yours. We are not 100% satisfied until each and every customer is 100% satisfied! We have 6 licensed and trained technicians to work on all of your Commercial HVAC and Restaurant Equipment Repair needs. Reliable, On Time Guarantee and knowledgeable technicians. For honest and reliable service our technicians are non-commissioned based. Most companies will fix either the hot side or cold side of your business……We happen to do both hot and cold equipment.
Tagged , , , , , , , , , , , , , , , , , , , , . Bookmark the permalink.

Comments are closed.